Krazycheck.com
Previous entry Next entry

Workin' Saturday

Sunday, October 25, 2009

This morning I finished (w/ Joe’s help) putting all 67 of the data cables down a 3” conduit. Really was a feat, but worked. I’m not sure we’ll be able to get anything more down, but don’t need to at this point! This is just the telephone and networking lines for the upstairs, and doesn’t include the mezzanine or the ground floor office spaces.

Then it was sanding the sheetrock in Jim’s office so I could put a second coat on most of that. (I had the mud too thick when applying the tape, so it’s too high… not the end of the world, but extra work in the end.) It’s coming nicely, however.

Once done, I ran 2 20 amp circuits to the server / telephone exchange, so I could board and tape where those wires are going to be truncated, which was next on the list. Rather tired today, so I cleaned up the area and quit early (3:00). Home for a shower and headed to Wetaskiwin to discuss external tin w/ John.

Ok, only one picture today. It’s not everywhere you can get a suntan while doing your business!


Back to the main page.

Copyright 2006 John Krajec