Vacation time
Friday, August 17, 2007After arriving last night (or early this morning, rather), we got up and started working on different projects. During breakfast we fixed the 3 way switch for over the kitchen counter island. Then it was installing light fixtures in the living room and entranceway. We also moved a lot of things out of the yard here up to the other house (as the excavator came to fix the driveway.)
Once that was done, I think it was time for supper.
After which, I started cutting tile for Brad, and he was measuring and setting. This was for the backboard around the kitchen. And this project took us till about 11:00 or 11:30 - I don’t remember what it was!